The little marina was so nice and we had such a pleasant evening, we asked the owners about a weekly rate so we could get the steering fixed properly and do some varnishing and other work that needs to be done. The rate was $275.00/ week plus $7.00/day for 50 amp electric. We decided to stay and went right to work. I figured out how to adapt the fittings that the shop had in stock connect to the steering system so I went back to the shop and had another line made. We installed and bled the hydraulic lines, installed a check valve in the bilge pump exhaust hose, washed out the bilge, and sanded the cap rails in preparation for the first coat of varnish on Saturday.
The marina had a side-by-side bicycle for two with a basket in the back. Dora, Sailor and I went for a tour of the quaint little town with street after street of old and new Victorian style homes. We were both beat by the end of the day. After dinner we watched a DVD from the marina’s collection.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment